Operational Performance - Q2 FY27
Volume Metrics:
- Total tonnage managed: ~1.28 million tonnes (~0.8% YoY growth)
- Collection & Transportation (C&T) volumes: ~0.60 million tonnes (~11.5% YoY growth)
- Processing volumes: ~0.68 million tonnes (~7.2% lower YoY)
Revenue Performance:
- Core revenue: Broadly stable YoY (~1% lower)
- C&T revenue: ~12% YoY growth
- Excluding power sales from base quarter: Core revenue grew ~2% YoY
Product Sales:
- RDF sold: ~49,000 tonnes (~23% YoY increase)
- Compost sold: ~2,000 tonnes (~38% lower YoY)
- Power generated: 0 million units (Q2 FY26: ~14.0 million units)
Operational Performance - H1 FY27
- Total tonnage: ~2.71 million tonnes (~4.5% YoY growth)
- Core revenue growth: ~3.8%
PCMC WtE Facility Incident Update
Incident Details:
- Date: July 8, 2026
- Location: Pimpri Chinchwad (PCMC) Waste-to-Energy facility
- Operator: Antony Lara Renewable Energy Private Limited (material subsidiary)
- Cause: Excessive monsoon rainfall caused collapse of adjacent legacy waste landfill outside operational perimeter
- Impact: Severe structural damage and tragic loss of nine lives
Restoration Status:
- Material Recovery Facility (MRF) and composting operations have resumed
- Processed ~33,600 tonnes of waste during Q2
- Collection and Transportation services continued uninterrupted across all project sites
- All OEMs working on inspection, repair and recommissioning
- Expected functional date: December 2026
Employee Support Measures
The Company continues to honor commitments to affected families including:
- Financial assistance
- Employment to next of kin
- Educational support for minor children
- Medical coverage for injured employees
Operational Drivers
Growth Factors:
- Ramp-up of newly commenced C&T operations in Mumbai awarded by Brihanmumbai Municipal Corporation (BMC)
- Higher volumes from existing C&T operations at Navi Mumbai, Panvel and Noida
- ~70% YoY increase in volumes at Construction & Demolition (C&D) waste processing facility in Mumbai
Challenges:
- Temporary suspension of energy operations at PCMC WtE facility
- Seasonally subdued demand for compost during monsoon months
- Temporary disruption at PCMC facility affecting compost production
#Tags: #AntonyWaste #BusinessUpdate #SEBIRegulation30 #WasteToEnergy #OperationalUpdate