Company Overview

Gujarat Industries Power Company Limited (GIPCL) is a public limited company incorporated in 1985, promoted by Gujarat State Fertilizers and Chemicals Ltd. (GSFC), Gujarat Alkalies and Chemicals Ltd. (GACL), and Gujarat Urja Vikas Nigam Ltd. (GUVNL). The company operates under the Energy and Petrochemicals Department, Government of Gujarat, and is listed on both BSE and NSE. GIPCL is engaged in electrical power generation with a current installed capacity of 1859.40 MW, comprising thermal (lignite and gas) and renewable (wind and solar) power plants.

Shareholding Pattern (as on 30.09.2026)

The company has 90,459 total shareholders with 15,52,15,944 shares outstanding. Promoters hold 56.57% (8,78,00,917 shares), Domestic Institutions hold 4.92% (76,43,990 shares), Foreign Institutions hold 2.73% (42,38,590 shares), Central/State Governments hold 1.44% (22,34,215 shares), Body Corporate holds 9.56% (1,48,36,224 shares), and Others hold 24.78% (3,84,62,008 shares).

Installed Capacity Details

GIPCL's power generation portfolio includes:

  • 145 MW Gas-based Power Plant (Vadodara, commissioned February 1992)
  • 165 MW Gas-based Power Plant (Vadodara, commissioned November 1997)
  • 250 MW Lignite-based Power Plant Phase I (Nani Naroli, commissioned November 1999)
  • 250 MW Lignite-based Power Plant Phase II (Nani Naroli, commissioned April 2010)
  • 5 MW Solar Plant (SLPP, Vastan, commissioned January 2012)
  • 1 MW Solar Plant (Amrol, commissioned April 2016)
  • 1 MW Solar Plant (SLPP, Vastan, commissioned May 2016)
  • 80 MW Solar Plant (Charanka Solar Park, commissioned September 2017)
  • 75 MW Solar Plant (Charanka Solar Park, commissioned June 2019)
  • 100 MW Solar Plant (Raghanesda Solar Park, commissioned August 2021)
  • 10.5 MW Wind Plant (Nakhatrana SN-1, Kutch, commissioned October 2016)
  • 10.5 MW Wind Plant (Nakhatrana SN-5, Kutch, commissioned October 2016)
  • 15 MW Wind Plant (Kotdapitha, Amreli, commissioned November 2016)
  • 26 MW Wind Plant (Rojmal, Botad & Rajkot, commissioned December 2016)
  • 50.4 MW Wind Plant (Kuchhadi, Porbandar, commissioned March 2017)
  • 75 MW Solar Plant (Vastan, commissioned June 2025)
  • 600 MW Solar Plant (Khavda Project Site, Bhuj, commissioned December 2025)

Future Growth Plans

Renewable Energy Park Development

GIPCL has been allocated 4750 Ha. land by the Government of Gujarat in the Khavda Hybrid Renewable Energy Park, Dist. Kutch to develop a 2375 MW Solar/Wind/Hybrid Renewable Energy Park. The entire RE Park capacity is expected to be fully developed and operational by December 2026.

500 MW Solar Project at Khavda

GIPCL executed a Power Purchase Agreement (PPA) with GUVNL in October 2023 for development of a 500 MW Solar PV Project at the Khavda RE Park. The PPA was approved by GERC vide Order dated 25/09/2024. The plant is partly ready for commissioning and awaiting CTUIL readiness for charging and power evacuation. Full commissioning is expected by November 2026.

750 MW Thermal Project

GIPCL has been entrusted by the Government of Gujarat to set up a 750 MW Lignite-based Thermal Power Project in July 2025 to improve grid stability and meet growing power demand in South Gujarat. GUVNL gave in-principle approval for a 25-year PPA in August 2025. Lignite will be supplied by GMDC from their Valia Mine (E, F, G) Blocks. Land is available at Village: Vastan, Taluka: Mangrol, Dist: Surat. Project Management and Environment Consultants have been appointed, and major site enabling activities completed. EPC tender was floated on 17/06/2026.

SLPP Phase-I Units R&M and Life Extension

Surat Lignite Power Plant Phase-I Units (Unit1 & 2, 2x125 MW) commissioned in 1999 require Renovation & Modernization (R&M) to reduce System Partial Loading, Forced Outages, and improve Reliability and Availability. Detailed Project Report was finalized in February 2024, and GUVNL approved it in May 2025 for life extension of 10 years. Project Management Consultant has been appointed, and order placed on BHEL in April 2026. R&M implementation is planned in FY 2028-29 (first unit) and FY 2029-30 (second unit).

Energy Storage

The 165 MW Station-II is being repurposed as a Long Duration Battery Energy Storage System (BESS) using Vanadium Redox Flow Battery Technology. GUVNL has given in-principle approval for a Pilot 20MW/120MWH VRFB facility under Section-62 of the Electricity Act, 2003. EPC tender process is underway.

Financial Performance (Rs. In Crores)

| Period | Revenue from Operations | EBITDA | Profit Before Tax | Profit After Tax |

| FY 2021-22 | 1,172.41 | 426.99 | 247.29 | 171.31 |

| FY 2022-23 | 1,355.56 | 455.96 | 253.43 | 188.69 |

| FY 2023-24 | 1,348.64 | 457.60 | 252.52 | 198.51 |

| FY 2024-25 | 1,256.26 | 474.96 | 272.95 | 211.43 |

| FY 2025-26 | 1,491.12 | 632.87 | 244.67 | 402.41 |

| HY 2026-27 | 930.43 | 549.39 | 263.19 | 197.13 |

Financial Position (Rs. In Crores)

| Date | Net Worth excluding CRR & OCI | Total Equity | Current Assets | Current Liabilities | Term Loan |

| 31.03.2022 | 2,891.59 | 3,044.41 | 884.24 | 347.25 | 484.21 |

| 31.03.2023 | 3,041.73 | 3,154.30 | 1,060.90 | 284.36 | 459.93 |

| 31.03.2024 | 3,175.77 | 3,305.51 | 1,161.92 | 336.52 | 390.77 |

| 31.03.2025 | 3,414.73 | 3,523.80 | 958.00 | 964.30 | 1,804.90 |

| 31.03.2026 | 3,748.46 | 3,840.24 | 817.04 | 913.38 | 3,373.46 |

| 30.09.2026 | 3,881.01 | 3,976.51 | 970.60 | 849.30 | 3,930.99 |

Financial Ratios

| Ratio | FY 2021-22 | FY 2022-23 | FY 2023-24 | FY 2024-25 | FY 2025-26 | HY 2026-27 |

| Current ratio (times) | 2.55 | 3.73 | 3.45 | 0.99 | 0.89 | 1.14 |

| Debt-equity ratio | 17.06% | 15.34% | 12.37% | 51.52% | 87.95% | 98.90% |

| Debt service coverage ratio (times) | 4.48 | 3.63 | 3.15 | 3.55 | 4.13 | 3.48 |

| Return on Equity | 5.81% | 6.09% | 6.15% | 6.19% | 10.93% | 5.04% |

| Inventory turnover ratio (times) | 5.26 | 5.60 | 5.56 | 5.49 | 6.75 | 2.91 |

| Trade receivables turnover ratio (times) | 3.76 | 4.27 | 4.55 | 5.18 | 6.42 | 3.55 |

| Trade payables turnover ratio (times) | 8.10 | 9.61 | 9.33 | 8.45 | 11.37 | 6.55 |

| Net capital turnover ratio (times) | 2.17 | 1.74 | 1.62 | -198.03 | -15.39 | 7.56 |

| Net profit ratio | 14.68% | 13.99% | 14.81% | 16.94% | 27.14% | 21.50% |

| Return on capital employed | 7.37% | 7.50% | 7.34% | 5.44% | 4.86% | 4.55% |

| EPS (Rs.) | 11.33 | 12.48 | 13.12 | 13.97 | 25.93 | 12.70 |

| Asset Coverage Ratio (times) | 5.63 | 6.48 | 8.09 | 3.21 | 2.31 | 2.08 |

| TOL/TNW | 25.84% | 22.19% | 20.53% | 79.00% | 111.01% | 122.53% |

| Interest Coverage Ratio (times) | 9.60 | 7.75 | 7.79 | 9.55 | 3.21 | 3.57 |

| Return on Net worth | 5.92% | 6.20% | 6.25% | 6.19% | 10.74% | 5.24% |

| Book Value per Share (Rs.) | 201.28 | 208.55 | 218.54 | 232.89 | 247.41 | 256.19 |

Technical Performance - Thermal Plants

| Plant | FY 2021-22 | FY 2022-23 | FY 2023-24 | FY 2024-25 | FY 2025-26 | HY 2026-27 |

| 145MW GAS Based | 29.25%* | - | - | Not in operation | - | - |

| 250MW Lignite Phase I | 61.31% | 62.38% | 66.86% | 69.12% | 70.62% | 68.52% |

| 250MW Lignite Phase II | 72.44% | 70.24% | 73.62% | 75.40% | 74.84% | 64.43% |

| All India Coal/Lignite** | 58.87% | 64.15% | 69.09% | 69.45%# | 65.57% | 65.57%# |

*Considering plant operation till 26.10.2021

#till 31.03.2026

Technical Performance - Solar Plants

| Plant | FY 2021-22 | FY 2022-23 | FY 2023-24 | FY 2024-25 | FY 2025-26 | HY 2026-27 |

| 40MW Charanka Plot 1 | 19.70% | 17.37% | 20.07% | 21.39% | 19.31% | 17.48% |

| 40MW Charanka Plot 3 | 21.05% | 18.68% | 20.64% | 21.63% | 18.49% | 17.27% |

| 75MW Charanka | 22.40% | 20.55% | 20.68% | 19.12% | 16.17% | 17.28% |

| 100MW Raghanesda | 28.14% | 29.24% | 28.49% | 27.93% | 28.34% | 26.06% |

| 75MW Vastan | NA | NA | NA | NA | 21.50% | 20.78% |

| 600MW Khavda | NA | NA | NA | NA | 19.89% | 25.11% |

| Solar Plants as a whole | 22.99% | 22.88% | 23.29% | 22.94% | 20.53% | 23.43% |

Technical Performance - Wind Plants

| Plant | FY 2021-22 | FY 2022-23 | FY 2023-24 | FY 2024-25 | FY 2025-26 | HY 2026-27 |

| 10.5MW Nakhatrana SN-1 | 23.08% | 21.67% | 21.72% | 13.49% | 17.66% | 30.46% |

| 10.5MW Nakhatrana SN-5 | 27.63% | 26.24% | 25.52% | 20.94% | 23.72% | 36.44% |

| 15MW Kotdapitha | 20.60% | 17.98% | 9.72% | 11.05% | 13.29% | 20.42% |

| 26MW Rojmal | 18.22% | 17.77% | 17.83% | 15.87% | 15.86% | 22.30% |

| 50.4MW Kuchhadi | 25.00% | 24.33% | 25.34% | 19.94% | 22.19% | 29.41% |

| Wind Plants as a whole | 22.91% | 21.90% | 21.20% | 17.30% | 19.26% | 27.32% |

All India Installed Capacity (As on 31.10.2026)

Total installed capacity: 563,113.34 MW

Breakdown by ownership:

  • State: 130,638.03 MW
  • Private: 305,917.38 MW
  • Central: 126,557.92 MW

Breakdown by source:

  • Thermal: 250,869.86 MW (Coal: 225,067.50 MW, Lignite: 6,370.00 MW, Gas: 19,144.02 MW, Diesel: 288.34 MW)
  • Nuclear: 8,780.00 MW
  • Hydro: 52,314.66 MW
  • Renewable (MNRE): 251,148.81 MW

Management

Board of Directors includes Dr. Jayanti S. Ravi, IAS (Chairperson), Shri Prabhat Singh, Dr. Mamata Biswal, Shri Jenu Devan, IAS, Shri Rajender Kumar, IAS, Smt. Shalini Agarwal, IAS, Shri Nitin Chandrashanker Shukla, Dr. Ravindrarai Harshadrai Dholakia, Prof. Vishal Gupta, Shri Susanta Kumar Roy, Smt. Suchita Gupta, CS Sanjaykumar Shukdev Bhatt, and Smt. Vatsala Vasudeva, IAS (Managing Director).

Key Managerial Personnel include Shri N K Purohit (Executive Director - Mines), Shri K K Bhatt (Executive Director - Finance & CFO), and Shri Shalin Patel (Company Secretary & Compliance Officer).

Senior Executives include Shri J S Ranawat (Chief General Manager - RE) and Shri C S Jadeja (Chief General Manager - Thermal).