Godawari Power and Ispat Limited has submitted a regulatory filing to the BSE Limited and the National Stock Exchange of India Limited intimating them about the resumption of operations at its iron ore pellet plant.
The company refers to its earlier intimation dated 14 July 2026, in which it had informed about the temporary suspension of production at this specific facility.
The plant in question is a 2.0 Million Tonnes Per Annum (MTPA) Iron Ore Pellet Plant located in Phase-II, Siltara Industrial Area, Raipur, Chhattisgarh.
The company states that, in view of improved market conditions, production in the said Iron Ore Pellet Plant has now resumed normally.
The filing is signed by Y.C. Rao, Company Secretary, and includes a digital signature timestamped 29 August 2026 at 11:40:02 IST.