JSW Steel reported consolidated crude steel production of 21.18 lakh tonnes for April 2026, down 1% YoY.
Indian operations produced 20.40 lakh tonnes, impacted by Blast Furnace 3 shutdown at Vijayanagar for capacity upgradation.
Capacity utilization for Indian operations was 83% including BF3 shutdown, while excluding BF3 capacity utilization reached ~94%.