NTPC Green Energy declares 150MW solar capacity commercial operation from April 18, 2026.
Project is part of 300MW solar facility in Rajasthan through subsidiary ONGC NTPC Green.
Group installed capacity increases to 10,276.40MW from previous 10,126.40MW.