Date: September 26, 2026

Operational Update

NTPC Green Energy Limited announced that the first part capacity of 81.34 MW of the Kalasar Solar Energy Project at Bikaner, Rajasthan has been declared on commercial operation effective 00:00 hours of September 26, 2026.

This solar capacity is part of the 650 MW solar component under the 500 MW REMCL RTC Project of NTPC Renewable Energy Limited, which is a wholly owned subsidiary of NTPC Green Energy Limited.

Capacity Update

With this addition:

  • The current commercial capacity of NTPC Green Energy Limited group increases from 10,977.23 MW to 11,058.57 MW
  • This represents a net addition of 81.34 MW to the group's installed capacity