Date: 30th September 2026 (NTPC Limited disclosure), 29th September 2026 (NTPC Green Energy Limited disclosure)
Operational Update
NTPC Green Energy Limited (NGEL), a subsidiary of NTPC Limited, has declared commercial operation for additional capacity at its Kalasar Solar Energy Project in Bikaner, Rajasthan.
Project Details:
- Second part capacity: 73.06 MW
- Third part capacity: 80.88 MW
- Total additional capacity declared: 153.94 MW
- Effective date: 1st October 2026 at 00:00 hours
- Project location: Bikaner, Rajasthan
Project Context:
The Kalasar Solar Energy Project is part of the 650 MW solar component under the 500 MW REMCL RTC Project of NTPC Renewable Energy Limited, which is a wholly owned subsidiary of NTPC Green Energy Limited and a step-down subsidiary of NTPC Limited.
Capacity Impact:
NTPC Green Energy Limited Group:
- Commercial capacity increases to: 11,058.57 MW
- Installed capacity increases to: 11,212.51 MW
NTPC Limited Group:
- Total installed capacity: 91,456 MW
- Total commercial capacity: 90,376 MW