NTPC Green Energy declares commercial operation for 62.5 MW solar capacity across two Rajasthan projects effective May 15, 2026.
The declaration increases NTPC Green Energy Group's total installed capacity to 10,516.40 MW from 10,453.90 MW.
Both projects are developed by step-down subsidiaries of joint venture ONGC NTPC Green Energy Private Limited.
Disclosure made under SEBI Listing Regulations for material operational milestone achievement.