NTPC Green Energy subsidiary declares commercial operation of 87.5 MW solar capacity in Rajasthan effective 19th April 2026.
The project is part of a 150 MW solar facility developed by step-down subsidiary Project Eleven Renewable Power.
NTPC Group's total installed capacity reaches 89,615 MW while commercial capacity stands at 88,535 MW.
NTPC Green Energy Group's commercial capacity increases to 10,276.4 MW with total installed at 10,363.9 MW.