NTPC Green Energy Ltd. (NGEL) Group surpasses 10 GW installed capacity, reaching 10,076 MW as of March 31, 2026.
The group added 4,175 MW in FY 2024-25, including 2,065 MW in Q4, with the commissioning of Khavda-I (78.02 MW) and Khavda-II (90 MW) projects.
The Khavda Renewable Energy Park now has 2,560 MW, with Khavda-I at 1,255 MW and Khavda-II at 1,005 MW of its 1,200 MW planned capacity.