NTPC declares COD of 75 MW (final tranche) of Bhadla Solar PV Project, Rajasthan, effective 25th March 2026.
NTPC also declares COD of 105 MW (fifth tranche) of 1200 MW Khavda-II Solar PV Project, Gujarat, effective 29th March 2026.
Post these additions, NTPC Green Energy Group installed capacity rises to 9,907.68 MW; NTPC Group total installed capacity stands at 88,889 MW.