PNC Infratech received a Letter of Acceptance from UP State Bridge Corporation for a major bridge construction project in Kanpur.
The joint venture secured the EPC contract with a negotiated price of ₹559.53 crore, reduced from the initial bid of ₹571.81 crore.
The project involves constructing a 4-lane bridge over the Ganga River with approach roads and has a completion period of 36 months.