PowerGrid commissioned the Arun-3 (900 MW) HEP Nepal transmission project (Indian portion) effective 03.09.2023.
The commissioning is per CERC Tariff Regulations 2019 and CERC Order No. 210/TT/2024 dated 10.03.2026.
Disclosure filed under Regulation 30 of SEBI LODR Regulations, 2015 on 27.03.2026.