Regaal Resources Limited has filed a regulatory disclosure pursuant to SEBI Listing Regulations (Regulation 30 read with Schedule III) regarding the restoration of operations at its manufacturing facility.

The disclosure is a continuation of earlier disclosures dated September 10, 2026, and October 1, 2026, concerning operational disruption caused by damage to a turbine.

Event Details

  • Nature of Event: Damage was detected on August 26, 2026, in the rotor and fan of one of the company's turbines ("The Turbine") at its newly commissioned manufacturing facility.
  • Facility Location: Bhatgaon, Galgalia Check Post, Thakurganj Block, District-Kishanganj, Bihar – 855106.
  • Turbine Capacity: 10 MW.
  • Facility Capacity: 825 TPD (Tonnes Per Day).

Restoration and Repair

Repair and recommissioning activities of the turbine have been successfully completed, and operations have been restored. The company undertook necessary inspection, assessment, and repair measures in consultation with technical experts and equipment/service providers. The process involved:

  • Repair/replacement of damaged components
  • Testing
  • Re-commissioning
  • Performance checks

The company is taking necessary measures to ensure stable and normal operations of the facility.

Financial Impact

  • Repair Cost: INR 90 lakhs plus actual freight
  • Insurance Claim: The company has claimed Rs 90 lakhs plus actual freight for the loss/damage incurred. The realization of the claim is currently under process with the Insurance Company.

Operational Impact

During the repair period (August 26, 2026, to restoration date), the additional capacity of 10 MW associated with the turbine was not operational. This resulted in a temporary impact on the incremental production capacity of the newly commissioned manufacturing facility.

The company had sufficient stock to service its existing and ongoing customer orders, which remained unaffected during the repair period.