SWELECT Energy Systems commissioned a new 110/33 KV pooling substation for solar power evacuation.
The substation includes a 1 X 50 MVA power transformer at Sirungattur, Tamil Nadu.
The facility supports evacuation of 50 MW solar power in Villupuram Operation Circle.
The commissioning was completed on April 16, 2026, as disclosed to stock exchanges.