  • Approving Authority: Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi.
  • Total Project Length: 190.76 kilometres.
  • Total Project Cost: ₹7,597.16 crore (capital cost).
  • Project Components:
  • NH-63 Armur-Jagityal-Mancherial: To be widened to 4 lanes under the Hybrid Annuity Model (HAM).
  • NH-563 Jagityal-Karimnagar: To be widened to 4 lanes under the Build-Operate-Transfer (Toll) [BOT (Toll)] model.
  • Project is divided into three work packages.
  • Geographical Coverage: The projects are located in the Telangana districts of Nizamabad, Jagityal, Mancherial, and Karimnagar.
  • Detailed Segment-wise Breakdown (from Appendix):
  • NH-63 Armur-Jagityal Section:
  • Length: 63.600 km
  • Brownfield Length: 17.95 km
  • Greenfield Length: 45.65 km
  • Civil Cost: ₹1,266.58 crore
  • Land & Other Pre-construction Cost: ₹504.26 crore
  • Total Capital Cost: ₹2,471.76 crore
  • Model: Hybrid Annuity Model (HAM)
  • Concession Period: 17.5 years (2.5 years construction + 15 years operation & maintenance)
  • FY 2024-25 AADT: 14,949 PCU/day
  • NH-63 Jagityal-Mancherial Section:
  • Length: 68.295 km
  • Brownfield Length: 2.05 km
  • Greenfield Length: 66.10 km
  • Civil Cost: ₹1,477.17 crore
  • Land & Other Pre-construction Cost: ₹436.93 crore
  • Total Capital Cost: ₹2,730.72 crore
  • Model: Hybrid Annuity Model (HAM)
  • Concession Period: 17.5 years (2.5 years construction + 15 years operation & maintenance)
  • FY 2024-25 AADT: 12,084 PCU/day
  • NH-563 Jagityal-Karimnagar Section:
  • Length: 58.866 km
  • Brownfield Length: 24.14 km
  • Greenfield Length: 34.96 km
  • Civil Cost: ₹1,455.01 crore
  • Land & Other Pre-construction Cost: ₹394.53 crore
  • Total Capital Cost: ₹2,394.68 crore
  • Model: Build-Operate-Transfer (Toll) [BOT (Toll)]
  • Concession Period: 20 years (includes 2.5 years construction)
  • FY 2024-25 AADT: 20,446 PCU/day
  • Expected Benefits:
  • Travel time between Armur and Mancherial expected to reduce by approximately 1 hour 30 minutes.
  • Travel time between Jagityal and Karimnagar expected to reduce by approximately 45 minutes.
  • Will ensure safe, fast, and seamless connectivity for both passenger and freight movement.
  • Significant reduction in fuel consumption, carbon emissions, and vehicle operating costs.
  • Will connect 5 economic centers, 7 social nodes, and 10 logistic nodes, aligning with PM GatiShakti principles.
  • Expected to have a positive impact on the country's Logistics Performance Index (LPI).
  • Employment generation capacity: 77.13 lakh man-days (34.43 lakh direct and 42.7 lakh indirect).