TGV SRAAC Limited intimates BSE of 2.5 MWp solar power capacity addition under SEBI LODR Regulation 30.
Total solar power generating capacity increases from 55.40 MWp to 57.90 MWp post this addition.
Disclosure is in continuation of an earlier BSE submission dated September 29, 2025.