Trident Limited commissioned an additional 5.40 MWp rooftop solar power project at Budhni, Madhya Pradesh on March 27, 2026.
Total installed solar capacity at the Budhni facility now stands at 57.32 MWp, up from 51.92 MWp.
The ~₹10 crore investment was funded entirely through internal accruals, aimed at reducing carbon footprint via renewable energy adoption.