Key Strategic and Corporate Updates

Group Restructuring & Leadership:

  • IL JIN acquired the balance 40% stake in Power-One and 1.5% stake in Ascent Circuits through a share swap arrangement involving Compulsorily Convertible Preference Shares (CCPS). Consequently, both companies are now wholly-owned subsidiaries of IL JIN.
  • Mr. Sanjay Arora, previously leading the Electronics Division, has been appointed President, New Businesses and Group Evolution. He will now spearhead the Mobile Division and organizational development.
  • Mr. Satendra Singh has been appointed CEO and Whole-Time Director of IL JIN Electronics. He has over three decades of experience in the electronic circuit sector and was previously the CEO of a listed EMS company.
  • The mobile business (production for OPPO, OnePlus, and Realme) will be housed under Amber Enterprises in a dedicated, wholly-owned subsidiary named Amber Digital Technologies.

Operational Updates:

  • The greenfield facility for Sidwal (heating, ventilation, air conditioning, doors, and gangways) in Faridabad is now operational and scaling up production capacity.
  • The IL JIN facility, which was affected by a fire incident, has resumed operations and is now operational.

Financial Performance Highlights

Consolidated H1 FY27 (Apr-Sep 2026):

  • Revenue: ₹6,515 crores, up 28% YoY from ₹5,096 crores.
  • Operating EBITDA: ₹464 crores, up 29% YoY from ₹361 crores. This figure is before ESOP expenses and other non-operating items.
  • The Operating EBITDA is stated after adjusting for a non-operational, non-cash impact of ₹28.8 crores related to the consumption of inventory that was fair-valued during the Purchase Price Allocation (PPA) for the acquisitions of Power-One, Unitronics, and Shogini. The remaining PPA adjustment to be absorbed is approximately ₹32 crores, to be completed by year-end.
  • Adjusted PAT: ₹69 crores (before exceptional items).
  • Exceptional Loss: ₹132.2 crores, comprising ₹125.9 crores related to Ascent share purchase and ₹6.3 crores related to the difference between the fire loss amount and the expected insurance receivable based on documents submitted to date.

Consolidated Q2 FY27 (Jul-Sep 2026):

  • Revenue: ₹2,627 crores, up 60% YoY from ₹1,647 crores.
  • Operating EBITDA: ₹127 crores, up 30% YoY from ₹98 crores. This includes a ₹13.5 crore inventory PPA adjustment for the quarter.
  • Adjusted Loss After Tax: ₹57 crores (before exceptional items).
  • Exceptional Loss: ₹9.5 crores, comprising ₹3.2 crores (Ascent share purchase) and ₹6.3 crores (fire loss vs. insurance).

Divisional Performance Overview (Q2 FY27)

1. Consumer Durables (CD) Division:

  • Revenue: ₹1,227 crores, up 41% YoY from ₹873 crores.
  • Operating EBITDA: ₹4 crores.
  • Margins were pressured due to increased commodity prices (copper, aluminum, steel, resin), foreign currency fluctuation, minimum wage revision, and costs related to the ramp-up of the new Sri City plant (currently at 40% utilization).

2. Electronics Division:

  • Revenue: ₹1,248 crores, up 94% YoY from ₹642 crores.
  • Operating EBITDA: ₹116 crores, up 195% YoY.

3. Railways Subsystems & Defence Division:

  • Revenue: ₹152 crores, up 15% YoY from ₹132 crores.
  • Operating EBITDA: ₹7 crores.
  • Margins were affected by commodity inflation, forex fluctuation, and minimum wage revision on fixed-price contracts.

Balance Sheet & Capex

  • Net Debt: ₹2,582 crores.
  • Net Working Capital Days: 53 days.
  • Expected Full-Year Capex: ₹1,800 - ₹2,000 crores.

Guidance and Outlook

Consumer Durables:

  • The company maintains its guidance that FY27 margins will be impacted by 50-100 basis points, assuming commodities remain at H1 levels. Further commodity spikes would suppress percentage margins.
  • The company has a history of passing on commodity and currency changes to customers on a quarterly lag basis. 50% of the Q2 commodity increase was passed on in Q2, with the remaining 50% expected to be recovered in Q3.
  • The industry is expected to grow 20-22% in FY27, and the company expects to be in line with this growth. H1 industry growth was 18%.

Railways Subsystems & Defence:

  • Revenue growth guidance has been revised down to 15-20% from previous expectations, mainly due to delays in future project offtakes.
  • Margins are expected to be in the single digits (8-10%) for FY27 due to legacy fixed-price contracts.
  • Margins are expected to rebound to normalized levels (14-16%) from Q2 FY28 onwards as old projects are delivered.

Electronics Division (IL JIN):

  • IL JIN Electronics has filed its Draft Red Herring Prospectus (DRHP) with SEBI. Management cannot comment on details beyond the DRHP.
  • SEBI approval for the IPO is expected in the next 3-4 months. Post-approval, the company has one year to launch the IPO.
  • The board expects to maintain control of IL JIN with a shareholding above 51% post-IPO.

Other Financial Details

  • Net Interest Cost: Q1 FY27 was ~₹56 crores; Q2 FY27 was ~₹63-64 crores. Similar levels are expected for the next two quarters.
  • For the CD division (Amber standalone) in H1, specific cost impacts were identified:
  • ~₹32-35 crores from non-operational costs (forex fluctuation, ESOP).
  • ~₹22-25 crores from minimum wage revision in Haryana.
  • ~₹15-20 crores from the under-utilization of the new Sri City plant.
  • The company's business is seasonal, and net debt typically increases in Q2 and Q3 before reducing in Q4 and Q1.

Capex Timeline

  • Ascent Hosur expansion is expected to commence by H1 Calendar Year 2027.
  • Korea Circuit is expected to start in Calendar Year 2028.