Key Financial Performance
Q2FY27 Performance (YoY):
- Revenue from operations: ₹727 Cr (vs ₹634 Cr in Q2FY26), up 15%
- Total Income: ₹741 Cr (vs ₹641 Cr in Q2FY26), up 16%
- EBITDA: ₹283 Cr (vs ₹232 Cr in Q2FY26), up 22%
- EBITDA Margin: 38% (vs 36% in Q2FY26)
- Interest Cost: ₹92 Cr (vs ₹43 Cr in Q2FY26), up 114%
- Depreciation and Amortization: ₹60 Cr (vs ₹32 Cr in Q2FY26), up 88%
- Profit Before Tax: ₹131 Cr (vs ₹158 Cr in Q2FY26), down 17%
- Profit After Tax: ₹92 Cr (vs ₹117 Cr in Q2FY26), down 21%
- Basic EPS: ₹4.17 (vs ₹5.53 in Q2FY26), down 25%
H1FY27 Performance (YoY):
- Revenue from operations: ₹1,421 Cr (vs ₹1,237 Cr in H1FY26), up 15%
- Total Income: ₹1,451 Cr (vs ₹1,255 Cr in H1FY26), up 16%
- EBITDA: ₹545 Cr (vs ₹449 Cr in H1FY26), up 21%
- EBITDA Margin: 38% (vs 36% in H1FY26)
- Interest Cost: ₹172 Cr (vs ₹81 Cr in H1FY26), up 112%
- Depreciation and Amortization: ₹111 Cr (vs ₹61 Cr in H1FY26), up 82%
- Profit Before Tax: ₹261 Cr (vs ₹307 Cr in H1FY26), down 15%
- Profit After Tax: ₹187 Cr (vs ₹228 Cr in H1FY26), down 18%
- Basic EPS: ₹8.50 (vs ₹10.80 in H1FY26), down 21%
Balance Sheet (H1FY27 vs H1FY26):
- Net Worth: ₹3,525 Cr (vs ₹2,871 Cr), up 23%
- Fixed Assets: ₹6,993 Cr (vs ₹3,102 Cr), up 125%
- Other Non-Current Assets: ₹1,303 Cr (vs ₹89 Cr)
- Current Assets: ₹3,741 Cr (vs ₹2,972 Cr)
- Total Assets: ₹12,037 Cr (vs ₹6,164 Cr)
Cash Flow (H1FY27 vs H1FY26):
- Cash Flow from Operating Activities: ₹406 Cr (vs ₹270 Cr), up 50%
- Cash Flow from Investing Activities: -₹1,482 Cr (vs -₹1,172 Cr)
- Cash Flow from Financing Activities: ₹1,183 Cr (vs ₹974 Cr)
- Net Increase in Cash: ₹107 Cr (vs ₹73 Cr)
- Closing Cash Balance: ₹224 Cr (vs ₹192 Cr)
Strategic Developments and Acquisitions
- Signed binding offer to acquire Alfanar Energy (AEPL) and Netra Wind (NWPL) for approximately ₹2,410 Cr, adding 507.9 MW of operational wind assets
- Acquired DEK and Mavericks Green Energy (DMGEL) solar EPC company through subsidiary Sun Drops Energia
- Executed Battery Energy Storage System Purchase Agreement (BESPA) with GUVNL for 120 MW / 240 MWh standalone BESS project
- Total BESS portfolio now at 565 MW / 1,130 MWh, fully contracted
Operational Highlights and Capacity Additions
- Energized additional 317 MWp under GUVNL 677 MWp hybrid IPP project (cumulative 511 MWp)
- Commissioned 50 MWp under GUVNL 350 MWp solar IPP project (cumulative 301 MWp)
- Commissioned 269 MWp solar capacity for Coal India's Khavda project
- Commissioned 128 MWp solar project for MAHAGENCO in Maharashtra
- Total IPP portfolio expanded to 3.22 GW
Order Wins and Contract Updates
- Secured approximately ₹2,025 Cr EPC order for 550 MWp solar project from NACOF Oorja in Rajasthan
- Signed PPA with SJVN for 300 MW wind IPP project
- Received NTPC REL NOAs worth ₹621 Cr for BoS packages covering 650 MWp of solar projects in Rajasthan
- Received LOI for 76.6 MWp wind-solar hybrid project under Group Captive model
Resource Position and Infrastructure
- Land bank: 8,807 acres secured
- Evacuation capacity: 5,201 MW secured
- Backward integration: In-house manufacturing of solar & wind support structures, towers and PSS
- Digital operations: AI-integrated live equipment health monitoring powered by IBM Maximo
- Robotic solutions: 1,100+ water-less cleaning robots deployed
Business Model and Capacity Build-up
- Double engine business model combining EPC and IPP operations
- Total capacity increased from 4.15 GW to 8.33 GW in one year
- Commissioned 1.96 GW while booking 4.18 GW of fresh orders
- IPP share of revenue increased from 8% in Q2FY26 to 15% in Q2FY27
- H1FY27 generation already 31% above FY26 full year
Future Growth Platforms
- Battery Energy Storage Systems: Developing 10 GWh BESS + 10 GWh cell manufacturing capabilities
- Floating Solar: Secured 142 MW Kadana Dam order, among India's largest
- Energy Trading: CERC + GERC trading licenses secured, trading on pilot basis
- Sun Drops Energia: Scaling to 10 GWh BESS assembly and cell manufacturing by FY31
Corporate Structure and Group Overview
- KP Group comprises three listed platforms: KPI Green Energy, KP Energy, KP Green Engineering
- Business realignment: Sun Drops Energia handles projects up to 50 MW, KPI Green handles above 50 MW
- All inter-company transactions on arm's length basis
Environmental and Social Impact
- IPP portfolio at full run-rate equivalent to planting ~175 million trees annually
- Saves ~12 billion litres water annually compared to coal plants
- Avoids ~3 million tonnes of coal consumption annually
- Creates ~13,500 job-years across construction and O&M
- Reduces ~3 million tonnes CO2 emissions annually
Corporate Social Responsibility
- KP Human Development Foundation donated 30 tablets to T & TV School
- 120 students enrolled in Urja Noor Scholarship Program
- Supports 15 students preparing for civil services exams
- Donated 3 electric golf carts to New Civil Hospital, Surat
- Provides free medicines and tests at KP Divine Hiba Hospital (850+ patients benefited)
- 95% completion of Prabhu Nu Ghar, world's first old-age home for differently-abled
- Provided 25 traffic safety barricades to Surat City Traffic Police
Investor Relations Contact
ir.kpigreenenergy@kpigreenenergy.com / cs@kpgroup.co