Summary of Management Commentary & Financial Performance

Q2 & H1 FY27 Financial Highlights

  • Q2 FY27 Total Income: Increased by 8% Year-over-Year (YoY) to approximately ₹146.57 crores.
  • Q2 FY27 EBITDA: Improved by 12% YoY to ₹116.55 crores.
  • Q2 FY27 Profit After Tax (PAT): Remained steady at ₹81.57 crores (vs. ₹80.94 crores in Q2 FY26).
  • H1 FY27 Total Income: Marginally better by ~2% at ₹232.81 crores.
  • H1 FY27 EBITDA: Up by ~4% at ₹176.56 crores.
  • H1 FY27 PAT: Stood at ₹105.51 crores, slightly lower than the ₹109.56 crores in H1 FY26. The prior period included a one-time exceptional gain of ₹16 crores from a refund of excess interest paid in earlier years. Excluding this, H1 FY27 PAT would have been higher by approximately ₹12 crores on a like-to-like basis.
  • H1 FY27 Profit: The company recorded a profit of over ₹100 crores for the first half without any one-time income.
  • FY26 Full-Year EBITDA: Was disclosed as ₹205 crores.

Operational Performance & Capacity Update

  • Wind Generation: Wind conditions in Q2 were better than Q1, though overall wind availability in H1 was lower than the previous year. Despite this, generation increased due to capacity addition and better machine availability.
  • Plant Load Factor (PLF): For the major subsidiary (Beta), the H1 PLF was 26.82% and the Q2 PLF was 33.11%. PLFs in other subsidiaries ranged between 32% and 36% for the quarter. Solar PLF was approximately 25%.
  • Capacity Addition - Solar: A 17.6 MW solar plant was successfully commissioned on September 26, 2026. Its generation will accrue from Q3 FY27 onwards. This, alongside a previously commissioned 7 MW plant, brings total solar capacity to 24.6 MW. This capex was funded from the proceeds of a rights issue raised in August 2024.
  • Capacity Addition - Wind: A project to repower 7.8 MW of old wind turbines is almost complete, awaiting final statutory approvals for commissioning. An Engineering, Procurement, and Construction (EPC) contract has been signed for an additional 6.6 MW of new wind capacity, partly funded with tied-up debt.
  • Impact of New Assets: The new solar assets are expected to contribute incremental revenue of ~₹15.35 crores and EBITDA of ~₹14.5 crores. The 7.8 MW repowering project is expected to add ~1.7 crore units of generation, translating to ~₹9 crores in incremental revenue. Additional quarterly depreciation from the new solar capacity is estimated at ~₹3 crores.
  • Future Commissioning: The new wind assets are expected to be commissioned in Q3 or early Q4 FY27, with their full impact on generation expected in FY28.

Financial Position & Debt Structure

  • Total Outstanding Debt: Approximately ₹563 crores (₹562.9 crores).
  • Debt Service Reserve Account (DSRA): ₹81 crores.
  • Net Debt: Calculated at ~₹440 crores after accounting for the DSRA.
  • Cash Balances: The company maintains healthy cash balances of ₹110-120 crores as a cushion for wind generation variance and O&M maintenance.
  • Weighted Average Cost of Debt: is 9.09%, with individual project debts ranging from 8.2% to 9.25%.
  • Credit Rating: The main subsidiary's rating was upgraded by one notch to 'BBB'. The solar subsidiary has also received a 'BBB' rating. Management is targeting a further 25 basis points reduction in borrowing costs, contingent on RBI's monetary policy.

Strategic Outlook & Guidance

  • Organic Growth Plans: For FY28, the company plans to add ~30 MW primarily through wind repowering and some new capacity, potentially including a Battery Energy Storage System (BESS) project of 10-15 MWh.
  • Repowering Pipeline: Identified ~40-50 MW of existing wind capacity ripe for repowering, with a further ~75 MW opportunity including a 25 MW project in Andhra Pradesh.
  • Inorganic Growth & Strategic Action: Management is actively pursuing strategic inorganic transactions to create a "step change" in scale and address perceived market undervaluation. They expressed confidence in announcing a significant strategic action by the end of FY27 (March 2027). Conversations had paused due to unfavorable stock market conditions but are now reopening.
  • Market Focus: Future growth will be more wind-focused due to perceived surplus in solar generation capacity in the country. Demand from Commercial & Industrial (C&I) customers and data centers remains strong.
  • Shareholder Returns: Management indicated that surplus cash, beyond operational cushions, would be available for distribution to shareholders once new capacity is stabilized. They are considering all options to enhance shareholder value.

Other Key Disclosures

  • Carried Forward Losses: The company has approximately ₹800 crores in carried forward tax losses, primarily due to depreciation.
  • Non-Core Land Assets: The company holds over 1,000 acres of non-core land, with an estimated average value of ~₹5 lakhs per acre. Some of this land is pledged to lenders.
  • Croatian Operations: There are no current plans to sell the 51% stake in the 10 MW asset in Croatia (effectively 5 MW) as it is cash-generating and too small to justify a sale process.
  • Regulatory Challenges: Projects in Tamil Nadu have faced delays due to a change in state government and subsequent bureaucratic churn affecting approval processes. Management expects these delays to resolve within 1-1.5 months.
  • Customer Base: Over 70% of power is sold to C&I customers in Tamil Nadu across auto components, textiles, and software sectors. The remainder is sold to State Electricity Boards in Andhra Pradesh and Gujarat.