- Revenue: ₹1,211 crore (vs. ₹1,208 crore in Q2 FY2026)
- Operating EBITDA: ₹150 crore with margin of 12.42% (vs. ₹159 crore at 13.13% in Q2 FY2026)
- Net Profit After Tax: ₹83 crore, up 7.64% YoY (vs. ₹77 crore in Q2 FY2026)
H1 FY2027 Results (Consolidated):
- Revenue: ₹2,491 crore (vs. ₹2,442 crore in H1 FY2026)
- Operating EBITDA: ₹330 crore with margin of 13.24% (vs. ₹324 crore at 13.27% in H1 FY2026)
- Net Profit After Tax: ₹177 crore, up 15.94% YoY (vs. ₹152 crore in H1 FY2026)
Standalone Performance:
- Q2 Revenue: ₹1,203 crore (vs. ₹1,198 crore in Q2 FY2026)
- Q2 Operating EBITDA: ₹147 crore with margin of 12.22% (vs. ₹151 crore at 12.6% in Q2 FY2026)
- Q2 Net Profit After Tax: ₹51 crore (vs. ₹64 crore in Q2 FY2026)
- H1 Revenue: ₹2,477 crore (vs. ₹2,422 crore in H1 FY2026)
- H1 Operating EBITDA: ₹323 crore with margin of 13.04% (vs. ₹310 crore at 12.79% in H1 FY2026)
- H1 Net Profit After Tax: ₹133.5 crore (vs. ₹133.8 crore in H1 FY2026)
Revenue Breakdown by Sector (Q2):
- Hydropower: 71%
- Irrigation: 14%
- Tunneling: 11%
- Roads, Urban Infrastructure and Others: 4%
Order Book and Business Development
- Order book as of September 30, 2026: ₹13,546 crore
- Composition: Hydropower (64%), Irrigation (14%), Tunneling (4%), Roads, Urban Infrastructure and other segments (18%)
- Submitted bids aggregating approximately ₹30,000 crore across 15 projects
- Additional pipeline of ₹50,000 crore worth of projects expected for bidding over next 12 months
Key Project Milestones Achieved
Subansiri Hydropower Project:
- Unit 5 achieved wet commissioning and integrated with National Grid
- Five of eight units now operational supplying 1250 MW of clean power
- Remaining three units on track for completion within current financial year
Kwar Project (J&K):
- Crossed 4 lakh cubic meters of dam concreting (total requirement: 7.5 lakh cubic meters)
- TRT outlet bridge completed
- Draft tube structure work commenced
- Powerhouse excavation complete, concreting activities underway
Kiru Project (J&K):
- Completed approximately 12 lakh cubic meters of dam concreting (total requirement: 12.5 lakh cubic meters)
- Powerhouse slab concreting up to service floor completed for all four units
Sleemanabad Irrigation Project (Madhya Pradesh):
- Breakthrough of India's longest irrigation tunnel measuring approximately 12 kilometers
- Project moving towards final completion
- Expected to bring irrigation benefits to approximately 2.45 lakh hectares of farmland
Non-Core Asset Monetization
- Transferred entire 32% stake in ACP Tollways Private Limited for consideration of ₹55 crores
- Previous quarter land parcel sale realized ₹26 crores
- Total H1 FY2027 non-core asset monetization: ₹81 crores
Debt and Capital Structure
- Consolidated debt as of September 2026: ₹1,312 crore (vs. ₹1,187 crore as of March 2026)
- Client advances: ₹609 crore (vs. ₹622 crore as of March 2026)
- Debt equity ratio: 0.28
- Term debt: ₹350 crore
- Working capital debt: ₹960 crore
Promoter Shareholding Update
- Promoter pledge reduced from 88-90% to 67%
- Further reduction planned for next year after assessing performance
- Promoter stake currently at 31% (reduced from 39%)
Guidance and Outlook
- Revenue growth for FY2027 expected to be marginal (7-8%) instead of previously guided 10%
- Better growth visibility expected in FY2028 as new orders materialize
- Arbitration awards expected to contribute ₹100-150 crore annually (₹80 crore already realized this year)
- Capital expenditure estimated at approximately ₹150 crore annually for next 2-3 years