PONDY OXIDES AND CHEMICALS LIMITED POCL®
Financial Performance Highlights (H1 FY27)
- Revenue: INR 1,639 crores, representing a 33% year-on-year growth.
- Profit After Tax (PAT): INR 55.6 crores.
- Cash flow from operations turned positive during H1 FY27.
- The company maintained a net cash and debt-free position.
Segment-Wise Performance
Copper Business:
- Revenue grew approximately 4.5x year-on-year.
- Contribution to total revenue: 47%.
- Production Volume: 5,649 metric tons (H1 FY27).
- Sales Volume: 6,040 metric tons (H1 FY27).
- EBITDA per ton: INR 44,536, an increase of 30% YoY.
- Expected contribution for FY27: Approximately 45% of overall revenue.
Lead Business:
- Utilization of expanded 72,000 MTPA capacity: 40% in H1 FY27.
- EBITDA per ton: INR 18,617 for H1 FY27.
- Value-added products contributed 65% of lead segment revenue.
Market Mix
- Domestic market contribution: 54% of overall revenue.
- Export market contribution: 46% of overall revenue.
- Exports accounted for 55% of lead vertical and 39% of copper vertical revenues.
Strategic Initiatives and Expansion Projects
Copper Cathode Facility:
- A new 36,000 tons per annum copper cathode facility is being established at the Thervoy Kandigai plant in Tamil Nadu.
- Total Investment: Approximately INR 200 crores, fully funded through internal accruals.
- Amount incurred: INR 60 crores already spent.
- Execution is in two phases:
- Phase I (18,000 MTPA): Targeted commissioning by December 2026, with trial runs in Q4 FY27.
- Phase II (18,000 MTPA): Targeted by Q3 FY28.
- The facility will use pyro-refining and electro-refining processes to manufacture LME-grade copper cathodes.
- 60%-70% of internally generated recycled copper material is expected to be utilized in this facility.
Capacity Ramp-Up:
- The incremental 6,000 MTPA copper recycling capacity commissioned in Q4 FY26 is ramping up and is expected to achieve ~90% utilization in FY27.
- The expanded lead capacity is expected to ramp up to 70% utilization in the coming quarters.
Operational Challenges
- Geopolitical developments in West Asia caused considerable disruptions in global supply chains, affecting shipping routes and raw material movement.
- These challenges affected material availability and shipment schedules, leading to moderated lead production and sales volumes in H1 FY27.
- Profitability was pressured due to elevated input costs, with COGS increasing faster than revenue.
- The company is proactively strengthening its sourcing network and exploring alternative geographies to mitigate impact.
Management Guidance and Outlook
Volume Guidance:
- Lead: Targeting a minimum of 25,000 metric tons per quarter in FY28. For FY27, the company aims to be closer to 75,000 tons but cannot commit due to current challenges.
- Copper: Targeting in excess of 20,000 tons for FY28. For FY27, the company can achieve close to 10,000 tons.
EBITDA Guidance:
- Copper Recycling: INR 35,000 - 40,000 per ton.
- Copper Cathode: INR 65,000 - 70,000 per ton (approx. INR 65,000 per ton).
- Lead: Targeting to return to guided levels of INR 18,000 - INR 20,000 per ton.
Long-Term Targets (Target 2030):
- Over 15% volume growth.
- 20% plus CAGR in revenue and profitability.
- EBITDA margins over 8%.
- ROCE exceeding 20%.
- Over 60% of revenue from value-added products.
Question & Answer Highlights
Lead Volumes & Procurement: Management expects a turnaround and recovery in lead volumes by Q4 FY27. Procurement is being shifted to South America, Southeast Asia, and domestic sources. The target of 25,000 tons per quarter in FY28 is based on a status quo assumption of ongoing West Asia challenges.
Copper Volume Volatility: Some quarterly volatility in copper volumes is expected until the cathode plant is operational due to the multi-stage nature of the recycling process. Volumes are expected to stabilize post-commissioning.
Lead EBITDA Pressure: The sequential decline in lead EBITDA per ton (from ~INR 21,000 in Q1 to ~INR 16,000 in Q2) was attributed to a lower value-added product mix (65% vs. 85% in Q1) and elevated costs (power, fuel, logistics, fluxes). Management is renegotiating contracts with customers to pass on increased costs, with improvements expected from Q4.
Copper Cathode Supply & Sourcing: For the 18,000 MTPA Phase I cathode plant, ~6,000 tons of raw material will come from internal generation, and ~13,000 tons will be procured from outside. 80% of sourcing is expected to be imported, with 20% domestic. Supply contracts for the required quantity are already tied up.
LME Registration: The company clarified that hedging is different from LME brand registration. The cathode product will be fully hedged from the start. LME registration, which takes ~12 months, provides liquidity and quality assurance but is not a prerequisite for sales.
Capex: The total outlay for the copper cathode project is INR 200 cr. INR 60 cr has been spent. INR 140 cr is for Phase I, to be spent in the next 2-3 months. The remaining INR 60 cr for Phase II will be spent in FY28. No delays in equipment supply are foreseen.
Lithium-ion Recycling: The company is not currently looking at lithium-ion battery recycling, citing uncertainty over the technology's longevity and a lack of sufficient volumes to justify the business.
Closing Remarks
Management thanked participants, reaffirming its commitment to delivering sustainable, profitable growth and creating long-term value for all stakeholders.