Extracted Data Points

  • Approved by the Cabinet Committee on Economic Affairs, chaired by Prime Minister Shri Narendra Modi.
  • First GPRA project in the capital city of Amaravati and within the State of Andhra Pradesh.
  • Objective: To alleviate financial burden on Central Government employees, enhance morale, promote integrity, and contribute to overall well-being.
  • Enable employees to reside in close proximity to workplaces for efficient government functioning and effective discharge of duties.
  • Campus planned over an area of 17 acres.
  • Comprises 11 residential towers with a total of 1,504 dwelling units, ranging from Type II to Type VI, including refuge areas.
  • Basement parking facilities accommodating 1,972 Equivalent Car Spaces (ECS).
  • Total built-up area is 31.30 lakh sqft (2,90,762 sqm), including basement area of 9.10 lakh sqft (84,394 sqm).
  • Buildings to be planned and designed in compliance with green building standards, focusing on sustainable site planning, energy efficiency, water conservation, local materials, and occupant health.
  • Campus designed, constructed, and registered to achieve minimum GRIHA 4-Star Rating, complying with Energy Conservation and Sustainable Building Code (ECSBC) 2024 and Eco-Niwas Samhita (ENS) 2024.
  • Equipped with civic and community amenities: bank and ATM, post office, crèche, community hall with dining facilities, food court, shopping complex, service centre, and guest house.
  • Barrier-free built environment for Divyangjan (Persons with Disabilities) in compliance with accessibility standards.
  • Expected to generate approximately 7.00 lakh man-days of employment per annum during construction phase.
  • Sustained generation of around 50,000 man-days of employment per annum during operational phase.
  • Project cost: ₹1,234.91 crores.
  • Funded by Government of India through budgetary support under Head of Account: 4216 – Capital Outlay on Housing (Residential Buildings) – Voted.
  • Executed by Ministry of Housing & Urban Affairs through Central Public Works Department (CPWD).
  • Pre-bid activities have commenced, and preparation of tender documents is in progress.