Extracted Data Points:
- Total project length: 190.76 km
- Total capital cost: ₹7,597.16 crore
- Approval authority: Cabinet Committee on Economic Affairs chaired by Prime Minister Shri Narendra Modi
- Project consists of three work packages
NH-63 Armoor-Jagtial Section:
- Length: 63.600 km
- Brownfield length: 17.95 km
- Greenfield length: 45.65 km
- Total civil cost: ₹1,266.58 crore
- Land and other pre-construction cost: ₹504.26 crore
- Total capital cost: ₹2,471.76 crore
- Mode: Hybrid Annuity Model (HAM)
- Concession period: 17.5 years (2.5 years construction + 15 years O&M)
- Annual Average Daily Traffic (AADT) in FY 2024-25: 14,949 PCU/day
NH-63 Jagtial-Mancherial Section:
- Length: 68.295 km
- Brownfield length: 2.05 km
- Greenfield length: 66.10 km
- Total civil cost: ₹1,477.17 crore
- Land and other pre-construction cost: ₹436.93 crore
- Total capital cost: ₹2,730.72 crore
- Mode: Hybrid Annuity Model (HAM)
- Concession period: 17.5 years (2.5 years construction + 15 years O&M)
- Annual Average Daily Traffic (AADT) in FY 2024-25: 12,084 PCU/day
NH-563 Jagtial-Karimnagar Section:
- Length: 58.866 km
- Brownfield length: 24.14 km
- Greenfield length: 34.96 km
- Total civil cost: ₹1,455.01 crore
- Land and other pre-construction cost: ₹394.53 crore
- Total capital cost: ₹2,394.68 crore
- Mode: Build-Operate-Transfer (Toll) [BOT (Toll)]
- Concession period: 20 years (including 2.5 years construction)
- Annual Average Daily Traffic (AADT) in FY 2024-25: 20,446 PCU/day
Project Details:
- 4-lane configuration with bypasses to built-up areas with open tolling
- Design speed: 100 km/hour
- Districts covered: Nizamabad, Jagtial, Mancherial, Karimnagar
- Built-up areas along highway: Anksapoor, Korutla, Jagtial, Dharmapuri, Lakshettipet, Mancherial, Potharam, Gangadhara, Karimnagar
Economic Impact:
- Connects five Economic Nodes, seven Social Nodes and ten Logistic Nodes
- Expected positive impact on Logistic Performance Index (LPI) of the country
- Travel time reduction: 1 hour 30 minutes between Armoor and Mancherial, 45 minutes between Jagtial and Karimnagar
- Employment generation: 34.43 lakh man-days (direct) & 42.7 lakh man-days (indirect)
- Substantial reductions in fuel consumption, carbon emissions, and vehicle operating costs (VOC)
Economic Nodes:
- 2 SEZ: Siddipet, Warangal Urban
- Mega Food Parks: Nizamabad, Siddipet
- Fishing Seafood Cluster: Rajanna Sircilla
Social Nodes:
- Vemulawada, Kondagattu, Nagunur Fort, Dharmapuri, Kaleshwaram, Lower Mannair Dam, Quila Fort
Logistic Nodes:
- Railway Stations: Nizamabad, Lingampet/Jagtial, Peddapalli, Korutla, Mancherial, Poddur, Gangadhara, Karimnagar