Extracted Data Points:

  • Total project length: 190.76 km
  • Total capital cost: ₹7,597.16 crore
  • Approval authority: Cabinet Committee on Economic Affairs chaired by Prime Minister Shri Narendra Modi
  • Project consists of three work packages

NH-63 Armoor-Jagtial Section:

  • Length: 63.600 km
  • Brownfield length: 17.95 km
  • Greenfield length: 45.65 km
  • Total civil cost: ₹1,266.58 crore
  • Land and other pre-construction cost: ₹504.26 crore
  • Total capital cost: ₹2,471.76 crore
  • Mode: Hybrid Annuity Model (HAM)
  • Concession period: 17.5 years (2.5 years construction + 15 years O&M)
  • Annual Average Daily Traffic (AADT) in FY 2024-25: 14,949 PCU/day

NH-63 Jagtial-Mancherial Section:

  • Length: 68.295 km
  • Brownfield length: 2.05 km
  • Greenfield length: 66.10 km
  • Total civil cost: ₹1,477.17 crore
  • Land and other pre-construction cost: ₹436.93 crore
  • Total capital cost: ₹2,730.72 crore
  • Mode: Hybrid Annuity Model (HAM)
  • Concession period: 17.5 years (2.5 years construction + 15 years O&M)
  • Annual Average Daily Traffic (AADT) in FY 2024-25: 12,084 PCU/day

NH-563 Jagtial-Karimnagar Section:

  • Length: 58.866 km
  • Brownfield length: 24.14 km
  • Greenfield length: 34.96 km
  • Total civil cost: ₹1,455.01 crore
  • Land and other pre-construction cost: ₹394.53 crore
  • Total capital cost: ₹2,394.68 crore
  • Mode: Build-Operate-Transfer (Toll) [BOT (Toll)]
  • Concession period: 20 years (including 2.5 years construction)
  • Annual Average Daily Traffic (AADT) in FY 2024-25: 20,446 PCU/day

Project Details:

  • 4-lane configuration with bypasses to built-up areas with open tolling
  • Design speed: 100 km/hour
  • Districts covered: Nizamabad, Jagtial, Mancherial, Karimnagar
  • Built-up areas along highway: Anksapoor, Korutla, Jagtial, Dharmapuri, Lakshettipet, Mancherial, Potharam, Gangadhara, Karimnagar

Economic Impact:

  • Connects five Economic Nodes, seven Social Nodes and ten Logistic Nodes
  • Expected positive impact on Logistic Performance Index (LPI) of the country
  • Travel time reduction: 1 hour 30 minutes between Armoor and Mancherial, 45 minutes between Jagtial and Karimnagar
  • Employment generation: 34.43 lakh man-days (direct) & 42.7 lakh man-days (indirect)
  • Substantial reductions in fuel consumption, carbon emissions, and vehicle operating costs (VOC)

Economic Nodes:

  • 2 SEZ: Siddipet, Warangal Urban
  • Mega Food Parks: Nizamabad, Siddipet
  • Fishing Seafood Cluster: Rajanna Sircilla

Social Nodes:

  • Vemulawada, Kondagattu, Nagunur Fort, Dharmapuri, Kaleshwaram, Lower Mannair Dam, Quila Fort

Logistic Nodes:

  • Railway Stations: Nizamabad, Lingampet/Jagtial, Peddapalli, Korutla, Mancherial, Poddur, Gangadhara, Karimnagar