Prime Minister Narendra Modi will inaugurate and lay the foundation stone of Pune Metro projects worth approximately ₹21,800 crore on 3rd November 2026 at 12:30 PM via video conferencing. The event marks the inauguration of Pune Metro Line 3 (Pink Line), constructed at a cost of over ₹8,300 crore, and the foundation stone laying for Phase-II of the metro system, estimated to cost around ₹13,500 crore.
Pune Metro Line 3 Inauguration
The 23-kilometer Pink Line connects Maan to District Court Metro station, providing critical metro connectivity between Hinjewadi IT hub and Shivajinagar. This corridor is designed to improve access to one of Pune's major employment centers, facilitating the daily commute of thousands of IT professionals and other commuters. The line will integrate with the existing metro network, providing seamless connectivity across different parts of Pune. The project aims to reduce dependence on private vehicles, ease traffic congestion, lower vehicular emissions, and improve access to major commercial and residential areas.
A distinctive feature of Line 3 is its operational model, which will be entirely managed by women train operators, representing a first-of-its-kind initiative in gender-inclusive public transportation. Environmentally, the project emphasizes sustainability with approximately 30% of its total electricity requirements planned to be met through solar power.
Pune Metro Phase-II Foundation
Phase-II comprises four new lines: 2A, 2B, 4, and 4A, with a combined estimated cost of ₹13,500 crore. Lines 2A and 2B will span a total length of 12.75 kilometers, with Line 2A connecting Vanaz to Chandani Chowk and Line 2B connecting Ramwadi to Vitthalwadi, extending the existing east-west metro network. Line 4 will span approximately 25.52 kilometers, connecting Kharadi to Khadakwasla, while Line 4A will cover 6.12 kilometers, connecting Nal Stop to Manik Baug.
Connectivity and Integration
The new metro corridors will connect several important locations including Kharadi, Magarpatta, Hadapsar, Swargate, Manik Baug, Nanded City, Pune Cantonment, and Warje. The eastern extension from Ramwadi to Vitthalwadi will specifically improve connectivity to rapidly developing residential, commercial, and IT hubs in Kharadi and Wagholi. The corridors are designed to integrate with intercity bus services and the existing Pune Metro network through interchange facilities at Swargate, Nal Stop, and Kharadi Bypass, facilitating seamless connectivity across different parts of the city.
These projects collectively represent a significant enhancement to Pune's public transportation infrastructure, providing commuters with an efficient and integrated urban mobility network while addressing traffic congestion and environmental concerns.