Authority: National Company Law Appellate Tribunal Principal Bench, New Delhi
Order Date: 20 November 2026
Case Overview
The National Company Law Appellate Tribunal (NCLAT) heard three connected appeals (Comp. App. (AT) (Ins) No. 1808 of 2026, 1884 of 2026, and 1885 of 2026) preferred by LEEL Electricals Ltd (the Corporate Debtor) against three orders dated 05.08.2026 passed by the National Company Law Tribunal, Allahabad Bench (Adjudicating Authority).
The dispute concerned ownership of four specific machinery items: a GEMA Electrostatic Powder Coating System, a GEMA Reciprocator System, and two YANGLI Power Presses, allegedly purchased/imported by LEEL between December 2013 and March 2014 and located at the Rudrapur plant premises.
LEEL and Fedders Electric & Engineering Ltd (FEEL) were sister concerns operating from the same Rudrapur premises, with FEEL owning the land and LEEL possessing the building. Corporate Insolvency Resolution Process (CIRP) was initiated against FEEL on 14.08.2019 and against LEEL on 04.03.2020. FEEL's resolution plan by IM+ Capitals Ltd was approved on 06.10.2021, while LEEL was ordered into liquidation on 06.12.2021.
During LEEL's liquidation, the liquidator conducted an e-auction on 04.08.2022 under Block B for plant, machinery and inventories at Rudrapur as per Annexure IX of the process document. Mahavir Ship Breakers emerged as the successful bidder and received a sale certificate and possession letter dated 22.09.2022. When Mahavir attempted to remove machinery beyond Annexure IX, FEEL resisted, leading Mahavir to file IA No. 51/2023 seeking possession.
Subsequently, on 10.04.2023, LEEL was sold as a going concern under Block C to Krishna Ventures Ltd for ₹5.27 crores, limited to assets specified in Clause 9.1 of the process document (name and logo, possession rights in Rudrapur building, unlisted shares, and book receivables). This sale was approved by NCLT on 21.03.2024.
LEEL (through its new management Krishna Ventures) filed IA No. 558/2025 seeking impleadment in IA No. 51/2023 and IA No. 281/2026 seeking de-reservation of IA No. 51/2023. The Adjudicating Authority dismissed all three applications on 05.08.2026, rejecting Mahavir's claim to additional machinery but recording findings that supported FEEL's ownership of the disputed assets and vacating the interim restraint against alienation/removal.
Final Outcome
The NCLAT dismissed all three appeals filed by LEEL Electricals Ltd. The tribunal held that:
1. The disputed machinery never formed part of LEEL's liquidation estate and was never in the liquidator's custody under Section 35(1)(b) of the IBC
2. The assets were never included in the Asset Memorandum under Regulation 34 of the Liquidation Process Regulations
3. The Block B auction to Mahavir was strictly confined to assets specifically identified in Annexure IX/Schedule I
4. The Block C going-concern sale to Krishna Ventures was limited to assets described in Clause 9.1 of the process document, which excluded the disputed machinery
5. The liquidator's report and local commissioner's report (dated 31.05.2024) substantially supported FEEL's ownership claim, showing the machinery was located in FEEL's portion of the premises
6. LEEL failed to establish any right or interest in the disputed assets through the going-concern sale
The tribunal found no merit in LEEL's contention that the Adjudicating Authority exceeded its scope by determining ownership issues, noting that it was necessary to adjudicate the dispute between the parties properly.
Topics: Insolvency Proceedings, Asset Ownership Dispute