Case Overview
This appeal arose from the Order dated 15.05.2026 passed by the Adjudicating Authority (NCLT Hyderabad Bench) in C.P. (IB) No. 205/7/HDB/2021, which admitted India Power Corporation Limited (IPCL) to Corporate Insolvency Resolution Process (CIRP) under Section 7 of the Insolvency and Bankruptcy Code, 2016 (IBC). The petition was filed by State Bank of India (SBI) as financial creditor based on a corporate guarantee executed by IPCL on 23.09.2016 for financial facilities availed by Meenakshi Energy Ltd (MEL), the principal borrower.
The core dispute centered on the validity of the corporate guarantee executed without prior written consent of the West Bengal Electricity Regulatory Commission (WBERC) as required under Regulation 5.13.2 of the WBERC (Licensing and Conditions of License) Regulations, 2013. IPCL, an electricity distribution licensee since the 1920s, contended that the guarantee was void under Section 23 of the Indian Contract Act, 1872, as its object was forbidden by law and would defeat the provisions of electricity regulations designed to protect consumer interests.
The factual background revealed that IPCL acquired 95.07% shareholding in MEL from Engie Global Developments B.V. in 2016, with lenders requiring corporate guarantee as a precondition. Despite IPCL's initial objections about regulatory compliance, the guarantee was executed based on legal opinions obtained by lenders stating that guarantees could be given against non-regulated assets. IPCL made three applications to WBERC between 2017-2021 seeking approval, all of which were rejected. The third WBERC order dated 22.12.2021 specifically determined that prior consent under Regulation 5.13.2 was mandatory.
Final Outcome
The NCLAT partially allowed the appeals with the following findings and directions:
1. Validity of Corporate Guarantee: The Tribunal held that the deed of guarantee dated 23.09.2016 is partially valid and enforceable only to the extent of IPCL's separate business assets and surplus amounts from other and separate businesses. The guarantee was found to be crafted to sidestep Regulation 5.13.2 through clever drafting that brought even tangible fixed assets of IPCL's core electricity distribution business within the definition of "Non-Regulated assets."
2. Regulatory Compliance: The Court emphasized that Regulation 5.13.2 does not prohibit guarantees but requires prior consent to balance public interest in electricity distribution with commercial necessities. Both parties were found to have attempted to "outsmart the law and the Regulators" through a "customised designer-agreement."
3. CIRP Scope Limitations: The Resolution Professional is directed to:
- Hand over IPCL's core, non-core, and other electricity distribution businesses (as defined by WBERC Regulations) to erstwhile management within 30 days
- Only manage assets of IPCL's separate business, which include: 25 MW wind power plant in Gujarat, smart metering project in Madhya Pradesh, 133 MW solar project in Maharashtra, 150 KW distributed solar project, and 50% stake in a JV with Uniper SE
- Approach WBERC regarding liability of surplus income from core, non-core and other businesses
- Take charge of assets held by IPCL's wholly-owned subsidiary IPCL Power Limited (formerly Parmeshi Energy Limited)
4. Limitation: The plea of limitation was rejected as the Section 7 application filed on 26.02.2020 was within time regardless of which default date (28.12.2017, 31.01.2020 or 15.02.2020) was considered.
5. Costs: No costs were awarded.
The Tribunal upheld the existence of financial debt and default but significantly limited the scope of the CIRP to protect IPCL's electricity distribution operations which serve public interest.
Topics: Corporate Guarantee Validity, Electricity Regulatory Compliance, Limited Recourse CIRP