NCLT Ahmedabad adjourned Section 9 IBC proceedings against Sadbhav Engineering Limited to June 2026.
The adjournment was sought as a related matter against the same corporate debtor is reserved before another bench.
Counsel for the applicant was absent and directed to be present at the next hearing.