Authority: Supreme Court of India

Order Date: 26 November 2026

Case Overview

  • The matter arose from Suo Moto Writ Petitions (Civil) Nos. 7/2026, 8/2026 and 9/2026 concerning the Vision Document for the Taj Trapezium Zone (TTZ) and multiple applications for permission to fell trees, install transmission lines, and address illegal felling incidents.
  • Petitioners‑in‑person included Ms. Liz Mathew and a roster of senior advocates; respondents included the TTZ Authority, the Central Empowered Committee (CEC), the Uttar Pradesh Forest Department, and various government officials.
  • Key issues: (i) granting permission for the Integrated Mega‑City (IMC) project in Raipur and Rahankalan villages, (ii) authorising Powergrid Ghiror Transmission Ltd (PGTL) to fell trees for 765 kV and 400 kV transmission lines evacuating 3.5 GW of renewable energy from Rajasthan REZ Phase‑IV, (iii) addressing illegal felling of 454 trees at Dalmia Farm, Mathura, and imposing penalties.

Order Details

1. IA Nos. 99054/2024 and 99055/2024

  • The Court noted that a joint meeting of the TTZ Authority and CEC on 22‑09‑2026 granted permission for the IMC project subject to thirteen conditions (as reproduced in the Amicus Curiae’s note).
  • An email dated 06‑11‑2026 from Mr. A.K. Mohanty (CEC member) raised reservations; the Court directed a fresh joint meeting and a joint report within three weeks.
  • Post‑order date: 17‑12‑2026.

2. IA Nos. 243178/2026 and 275202/2026

  • The applications were to be forwarded to the CEC for consideration and appropriate recommendations.

3. IA No. 292695/2026

  • The Court ordered the matter to be posted on 05‑01‑2027.

4. IA No. 344174/2026

  • The Additional Solicitor General, on instructions, confirmed that authorities would comply with CEC Report No. 63 of 2025.
  • Permission for tree felling may be accorded provided prior intimation is given to the Divisional Forest Officer, who will supervise the felling.

5. IA Nos. 351366/2026 and 352878/2026 (Powergrid Ghiror Transmission Ltd)

  • PGTL seeks permission to install two ISTS lines (765 kV Dausa‑Ghiror and 400 kV Ghiror‑Firozabad) to evacuate 3.5 GW renewable energy.
  • CEC site inspections (30‑07‑2026 and 21‑23‑09‑2026) resulted in Report Nos. 30 and 31 (dated 28‑10‑2026) recommending:
  • 765 kV line: Fell 83 trees (67 in Agra, 16 in Firozabad) and prune 400 trees, instead of the originally proposed 297 felled and 1,735 pruned.
  • Conditions include supervision by Uttar Pradesh Forest Department, payment of prescribed felling costs, compensatory afforestation of 33.758 ha (for 16.003 ha diverted), fencing of plantation site, planting of at least 4,850 indigenous trees during the next rainy season, deposit of compensation amounts in a designated bank account, uploading compliance on CEC website, penalty of Rs 1,00,000 per unauthorized tree, and monitoring by the Ministry of Environment’s Lucknow regional office.
  • 400 kV line: Fell 187 trees (instead of 193) and prune 210 trees, with similar conditions; compensatory afforestation of 45.61 ha (for 22.8045 ha diverted), planting of at least 4,030 indigenous trees, same financial and monitoring requirements.
  • The Court inclined to allow the applications subject to strict compliance with the CEC‑imposed conditions and required an undertaking before felling begins.

6. IA Nos. 237739/2024 and 237765/2024 (Illegal Felling at Dalmia Farm)

  • Allegations: On night of 18‑19‑09‑2024, >300 trees were felled using JCB machines at Dalmia Farm, Vrindavan, Mathura, without permission under the Uttar Pradesh Protection of Trees Act, 1976.
  • FIR No. 413/2024 was registered; CEC inspection (Report 29/2024) found 454 trees felled (422 on private land, 32 on protected forest).
  • CEC Final Report 35/2024 recommended:

a) Minimum penalty of Rs 1,00,000 per tree → Rs 4.54 crore for 454 trees, to be deposited with Forest Department for new plantations.

b) Recovery of penalty under UP Protection of Trees Act.

c) Punitive action for 32 trees felled in protected forest under Indian Forest Act, 1972.

d) Action under Forest Conservation Act, 1980 for illegal entry path.

e) Restoration: plant 422 trees on private land and 32 in protected forest at land‑owner’s cost.

f) Plant and maintain 9,080 saplings (10× felled trees) at land‑owner’s cost; declare the land as protected forest.

g) Confiscate all illegally felled timber.

h) Mathura Vrindavan Development Authority to prevent construction on the site.

i) TTZ Authority to monitor compliance and report quarterly to CEC.

  • Subsequent orders (16‑12‑2024, 25‑03‑2025) imposed contempt notice on Shankar Agarwal, directed Forest Department actions, and recorded his admission of felled trees.
  • Compliance achieved: Rs 4.54 crore deposited (DD No. 033038, 21‑04‑2025); pending criminal complaints; Rs 52,03,500 deposited on 20‑01‑2026 for plantation; 9.46 ha registered to Forest Department (06‑01‑2026); Rs 2,55,23,800 deposited for sapling maintenance; timber confiscated and auctioned; vigilance by Mathura Vrindavan Development Authority.
  • Additional directions:

i) Notify the 9.46 ha land as forest within 8 weeks.

ii) Forest Department to submit compliance report; CEC to conduct spot inspection.

iii) Utilize the Rs 4.54 crore first for plantation; any surplus to be earmarked for afforestation in Mathura‑Vrindavan.

  • On penalty for contemnor: Court rejected further imprisonment; imposed lump‑sum penalty of Rs 50,00,000, to be distributed as:
  • Rs 20 lakhs to institution for destitute persons and widows.
  • Rs 10 lakhs to institution for persons with disabilities.
  • Rs 10 lakhs to orphan care institution.
  • Rs 10 lakhs to institution providing first‑aid/medical assistance to pilgrims.
  • Compliance report required; failure will revive contempt proceedings. Upon full deposit and compliance, contempt proceedings will be dropped and status‑quo order vacated. No effect on pending criminal cases.

7. IA No. 331428/2026 (in Suo Moto W.P. (Civil) No. 8/2026)

  • The Court directed the CEC to submit a report within four weeks.

Final Outcome

  • The Supreme Court mandated fresh coordination between TTZ Authority and CEC for the IMC project, approved PGTL’s tree‑felling requests with stringent afforestation and monitoring conditions, upheld substantial penalties for illegal felling, imposed an additional Rs 50 lakh fine on the contemnor with specific welfare allocations, and ordered further compliance reporting and forest‑land notification.

Topics: Tree Felling Permissions, Environmental Compliance, Renewable Energy Transmission