Authority: Uttarakhand High Court (Hon'ble Justice Pankaj Purohit, J.)

Order Date: Not specified

Case Overview

  • Petitioners: Saurabh Agarwal and others filed a writ petition (WPMS/3543/2026) against the State of Uttarakhand and other respondents, seeking a direction for an immediate joint technical inspection of an approximately 240‑metre main road at Akashdeep Enclave Phase‑I, Delhi Road, Ward No.11, Roorkee, Haridwar, together with eight subsidiary roads and the existing drainage outlet, to be conducted by competent engineering officers.
  • The petition also alleged that the Nagar Nigam’s construction activities over the road would cause the houses of the petitioners and other residents to be 1‑2 feet lower than the present construction level.
  • Respondents included the State of Uttarakhand, Nagar Nigam, and other municipal authorities. Counsel for petitioners and respondents were listed (Saurabh Budhori, Yogesh Pandey, Lalit Miglani, Faizan Ali, Aditya Pratap Singh).
  • The Nagar Nigam submitted that out of a total 270 metres of road, tile work had been completed for 235 metres, with the remaining 35 metres halted by petitioners Nos.1 and 3, and that no work was proposed outside the residence of petitioner No.2. An instruction dated 19‑Nov‑2026 was placed on record.

Final Outcome

  • The Court observed that the road had been substantially constructed and found no ground for interference.
  • The writ petition was dismissed.
  • Any pending applications, if any, were disposed of.