Detailed Clarifications by Agenda Item

Item No. 1: ESOS 2026 Scheme Details

  • Vesting under Vedanta ESOS 2026 is 100% performance-linked with no time-based or guaranteed vesting element
  • Continued employment is necessary for eligibility but does not guarantee vesting
  • Performance targets and threshold levels are derived from the company's annual operating plan approved by the Board
  • The scheme is multi-year with targets set at the beginning of each financial year
  • Performance weightage distribution: EBITDA (35%), FCF (50%), Carbon Footprint Reduction (15%) for business units; Weighted Average based on Target EBITDA for Corporate
  • Minimum vesting period of three years within maximum vesting period of five years
  • Grant quantum capped at 100% of employee's annual fixed pay
  • Vesting requires achievement against pre-defined performance parameters with minimum threshold gating (below threshold = zero vesting)
  • Threshold performance level yields 50% vesting, overachievement capped at 100%
  • Nomination and Remuneration Committee (NRC) approves final vesting percentage
  • Vedanta has operated similar performance share plan structure for 10 years

Item No. 2: ESOP Extension to Group Companies

  • Extension of VEDPOWER ESOP 2026 to employees of Holding Company and Subsidiary/Associate Companies
  • Restricted to entities with direct strategic, operational or business linkage to VEDPOWER
  • Cost of benefits will be cross-charged to relevant entity receiving employee services
  • No creation of dual employment relationships or conflicting fiduciary obligations
  • Holding company provides strategic, technical, commercial and functional leadership support

Item No. 3 and 4: Secondary Acquisition Mechanism

  • Secondary acquisition mechanism facilitates efficient implementation of VEDPOWER ESOS 2026 through Trust
  • Avoids issuance of additional shares by the Company
  • No incremental equity dilution beyond shareholder-approved limits
  • Trust acquires existing shares from secondary market
  • Vedanta has used ESOS Trust since inception of ESOS 2016 scheme

Item No. 9: Related Party Transactions Clarification

Transactions with VAML (Vedanta Aluminium Metal Limited)
  • Aggregate value of proposed transactions: ₹921 crore
  • Breakdown from VEDPOWER's perspective:
  • Recovery of expenses: ₹505 crore
  • Reimbursement of expenses: ₹330 crore
  • Purchase of goods and services: ₹50 crore
  • Sale of goods and services: ₹35 crore
  • Sale of assets: ₹0.55 crore
  • Purchase of assets: ₹0.55 crore
  • Reciprocal presentation explained: sale by VAML = purchase by VEDPOWER, recovery by VAML = reimbursement by VEDPOWER
  • Purchase of power from VAML driven by operational requirements of Jharsuguda IPP (600 MW)
  • Power required during shutdowns, maintenance periods, or non-generation periods to maintain essential plant services
Transactions with VEDL (Vedanta Limited)
  • Aggregate proposed related party transactions: ₹48.6 billion
  • Includes ₹8.42 billion of expense recoveries and reimbursements
  • Arises from transfer of Sakti Thermal Power Plant from VEDL to VEDPOWER
  • Continuation of contractual, administrative and operational arrangements during transition
  • Changes to FSAs, PPAs and associated records with authorities and counterparties in progress
  • Expenses attributable to transferred power business may be incurred by VEDL and recovered from VEDPOWER

Background Context

  • Jharsuguda IPP (600 MW) and Aluminium business (including 3015 MW CPP) previously part of Vedanta Limited (VEDL)
  • Under demerger: Jharsuguda IPP transferred to Vedanta Power Limited, remaining assets to Vedanta Aluminium Metal Limited (VAML)
  • Process of updating Fuel Supply Agreements (FSA), Power Purchase Agreements (PPA), registrations and associated records currently underway
  • Transitional arrangements continue under pre-demerger framework until changes completed

Commitment to Enhanced Disclosure

  • Company commits to provide enhanced disclosure of performance targets and actual achievement levels in future annual reports
  • Acknowledges IiAS's expectation of enhanced disclosure