Authority: Calcutta High Court (Constitutional Writ Jurisdiction, Appellate Side)
Order Date: 17 November 2026
Case Overview
- Petitioner: Lakshmi Shaw (appearing in person) seeking a separate new electricity service connection at 23 West Ghosh Para Road, Kankinara Bazar, North 24 Parganas, Pin‑743126.
- Respondent: West Bengal State Electricity Distribution Co. Ltd. (WBSEDCL) represented by advocate Dr. Madhusudan Saha Roy.
- Application for new connection filed on 4 June 2026; earlier supply to the premises (Meter No. SL020604, Consumer No. 155003153) was disconnected on 23 March 2026.
- Petitioner alleged WBSEDCL’s inaction, failure to inspect, and harassment; claimed entitlement to a fresh connection for her professional chamber.
- WBSEDCL contended that the existing connection could not be transferred, inspection was obstructed, technical formalities (main switch, Regulation 2.1(o) of Reg. No.55, WBERC Notification No.46) were not fulfilled, and that the earlier connection remained in the deceased father’s name.
- The court referenced prior judgments (WPA 10160 of 2026, WPA 5357 of 2026) noting repeated failure to provide access for meter reading, expiry of meter guarantee, and non‑compliance with Section 163 of the Electricity Act, 2003 and Clause 8 of WBERC Reg. 55, justifying disconnection.
- Regulation 4.6.1 of the West Bengal Electricity Supply Code, 2012 requires 180 days of continuous disconnection for deemed termination; only ~73 days had elapsed by the date of the new application.
- Regulation 4.6.4 mandates clearance of outstanding dues before a new connection can be granted after deemed termination; the court emphasized that this provision cannot be invoked prematurely.
- The court held that the petitioner’s application could not be treated as an independent request by an unrelated occupier, given her familial relationship to the previous consumer and her participation in earlier litigation.
Final Outcome
- The petition for a fresh electricity connection is dismissed.
- WBSEDCL is directed to conduct a thorough inspection of the premises and existing meter, determine any outstanding liabilities in accordance with Regulations 3.4.2, 4.6.1, and 4.6.4, and decide on the petitioner’s application within 12 weeks of this judgment.
- If obstruction occurs during inspection, WBSEDCL may seek police assistance, with costs recoverable from the petitioner.
- The judgment (WPA 17777 of 2026) is disposed of with the above directions.
Topics: Electricity Supply Regulation, Consumer Rights, Judicial Dispute