The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, has approved the development of the Second Container Terminal at Kamarajar Port Limited (KPL) under the Public Private Partnership (PPP) mode on a Design, Build, Finance, Operate and Transfer (DBFOT) basis. The project has an estimated cost of ₹4,288.26 crore (including GST), with the investment to be arranged entirely by the selected concessionaire under the DBFOT model. Additionally, KPL will bear an estimated dredging cost of ₹450 crore as indicated in the project proposal.
The project involves development of a 900-meter-long container terminal with a berth width of 30 meters and an annual handling capacity of 2.0 million TEUs, to be implemented in two phases. Phase I will have a capacity of 1.1 million TEUs with an estimated cost of ₹2,429.32 crore, while Phase II will add 0.9 million TEUs capacity at a cost of ₹1,858.94 crore. The terminal is designed with an 18-meter draft to handle large container vessels of up to 24,346 TEUs and 400 meters in length overall, strengthening KPL's ability to handle mainline vessels and improve international shipping connectivity.
The concession period is set for 40 years, including a 48-month construction period. Phase I is scheduled for completion within 24 months from the Date of Award of Concession, with commercial operations commencing in the 25th month. Construction of Phase II will occur from the 25th to the 48th month, with full commercial operations beginning in the 49th month. The project will be implemented through a transparent, open global bidding process.
The project aims to meet growing demand for containerized EXIM cargo from the Chennai-Ennore industrial region and southern hinterland, serving key sectors including automobiles and auto components, engineering goods, electronics, chemicals, and other manufactured products. Container traffic in India has grown at a compound annual growth rate of approximately 7% over the last five years, while KPL's container traffic has grown at about 9.9% during the same period. In FY 2025-26, KPL handled 49.08 million tonnes of cargo and 1,008 vessels, including over 7 lakh TEUs of container traffic. The existing container terminal has an installed capacity of 0.8 million TEUs per annum and handled approximately 0.7 million TEUs in FY 2025-26, representing 88% utilization.
The project is expected to generate employment for approximately 750 persons directly and indirectly during construction and about 800 persons during the operational phase. It supports the objectives of Atmanirbhar Bharat by augmenting domestic port capacity and improving logistics support for industries in Tamil Nadu, Karnataka, Andhra Pradesh, Telangana and adjoining hinterland. The project aligns with Maritime India Vision 2030 and Maritime Amrit Kaal Vision 2047, and there will be no financial implication for the Government of India as the investment is entirely private.
Kamarajar Port Limited, formerly known as Ennore Port Limited, is one of the 12 Major Ports of India wholly owned by Chennai Port Authority under the Ministry of Ports, Shipping and Waterways. During FY 2025-26, KPL recorded revenue of approximately ₹1,280 crore and Profit Before Tax of ₹924 crore, with cargo growth at a CAGR of 13.64% over the last five years.