The Ministry of Defence announced the delivery of Vindhyagiri (Yard 3024), the seventh and final ship of the Nilgiri class (Project 17A), to the Indian Navy on November 27, 2026. This delivery marks the successful culmination of Project 17A ship deliveries and represents a major milestone in achieving self-reliance in warship design and construction.
Vindhyagiri is the third ship of the class built by Garden Reach Shipbuilders and Engineers Ltd (GRSE) in Kolkata. The Project 17A frigates are versatile multi-mission platforms designed to address current and future maritime challenges. The ship is named after the Vindhyagiri mountain range in Karnataka and is a reincarnation of the erstwhile INS Vindhyagiri, a Leander-class frigate that served the Indian Navy from July 8, 1981, to June 11, 2012.
The frigates represent a quantum leap in naval design with advanced stealth capabilities, firepower, automation, and survivability features. Designed by the Warship Design Bureau and overseen by the Warship Overseeing Team (Kolkata), these ships feature a more advanced suite of weapons and sensors compared to the P17 (Shivalik) class. The propulsion system consists of Combined Diesel or Gas (CODOG) plants with diesel engines and gas turbines driving Controllable Pitch Propellers on each shaft, managed by an Integrated Platform Management System.
The delivery timeline shows significant improvement, with all seven P17A frigates delivered within 23 months from the first delivery of INS Nilgiri on December 20, 2024. Vindhyagiri's build period was compressed to 68 months compared to the 84 months taken for the first-of-class ship, demonstrating improved efficiency gained from institutional experience.
The project achieved 75% indigenization content and involved over 200 MSMEs. It generated employment for approximately 4,000 personnel directly and more than 10,000 personnel indirectly, showcasing substantial domestic industrial participation and job creation in the defense manufacturing sector.