India achieved a record 6.1 GW wind energy capacity addition in 2025–26, ranking fourth globally with 56.1 GW installed.
Government targets 100 GW wind capacity by 2030 and 156 GW by 2036, supported by a 1164 GW estimated potential at 150m height.
Policy measures include dedicated wind RPOs, ALMM enforcement, and a 500 MW CfD pilot to provide revenue certainty and boost manufacturing.
Wind power contributes 45% generation during peak demand hours, complementing solar and stabilizing the energy system.