New Kanpur Express Service Launch

Union Minister for Railways Ashwini Vaishnaw and Kanpur MP Ramesh Awasthi flagged off the inaugural run of the new Kanpur Express on November 16, 2026. The daily train service operates between Kanpur Central and Anand Vihar Terminal with 22 modern LHB coaches, covering a distance of 428 km in both directions. This service strengthens rail connectivity between Uttar Pradesh and the National Capital Region, providing additional travel options for passengers.

Route and Industrial Connectivity

The train connects several important economic centers along its route: Phaphund serving Auraiya's industrial areas including NTPC Auraiya and GAIL Pata; Etawah as an agricultural center; Tundla providing connectivity to Firozabad's glass industry; Hathras known for hing processing, brassware and agro-based industries; Aligarh for its lock industry and Aligarh Muslim University; Khurja for ceramic and pottery industry; Dadri as a logistics hub; and Ghaziabad as a major industrial center of NCR before reaching Anand Vihar Terminal, Delhi's multimodal transport hub.

Infrastructure Development Projects

Railway Minister Vaishnaw announced a 16-kilometre elevated railway track between Anwarganj and Mandhana that will provide permanent solution to Kanpur's decades-old traffic congestion at railway crossings. The Detailed Project Report has been completed and necessary approvals obtained, with construction expected to commence shortly.

Bullet Train Corridor Development

The Bullet Train North Corridor will connect Delhi, Agra, Kanpur, Varanasi, Lucknow, Ayodhya, extending to Patna, Siliguri and Guwahati. Once operational, it will reduce travel time between Delhi and Kanpur to approximately 1 hour 45 minutes, Lucknow-Kanpur to 27 minutes, and Kanpur-Prayagraj to 1 hour 15 minutes. This high-speed rail connectivity is expected to boost regional and economic development.

Station Redevelopment and Additional Initiatives

Redevelopment of Kanpur Central Railway Station is progressing at a rapid pace, with several additional railway infrastructure development initiatives planned for Kanpur in the coming period. MP Ramesh Awasthi confirmed that the Railways has approved the long-pending demand for construction of an elevated corridor on the Anwarganj-Mandhana railway section from 2017-18.