Cabinet Approval for Kamarajar Port Second Container Terminal
The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, has approved the development of a Second Container Terminal at Kamarajar Port Limited (KPL) under the Public Private Partnership mode on a Design, Build, Finance, Operate and Transfer basis. The project has an estimated cost of ₹4,288.26 crore including GST, with the investment to be arranged entirely by the selected concessionaire under the DBFOT model. Additionally, KPL will bear an estimated dredging cost of ₹450 crore as indicated in the project proposal.
Project Specifications and Capacity
The terminal will be 900 metres long with a berth width of 30 metres and a design draft of 18 metres, enabling it to handle large container vessels of up to 24,346 TEUs and 400 metres in length overall. The facility will have an annual container-handling capacity of 2.0 million TEUs, to be developed in two phases: Phase I with 1.1 million TEUs capacity and Phase II with 0.9 million TEUs capacity. This development aims to strengthen KPL's ability to handle larger mainline vessels and improve connectivity with international shipping routes.
Implementation Timeline and Financing
The concession period is set for 40 years, including a 48-month construction period. Phase I is scheduled for completion within 24 months from the Date of Award of Concession, with commercial operations commencing in the 25th month. Construction of Phase II will be undertaken from the 25th to the 48th month, with full commercial operations commencing in the 49th month. The project cost breakdown shows ₹2,429.32 crore for Phase I and ₹1,858.94 crore for Phase II, to be financed by the concessionaire who will recover investment through user charges under the Concession Agreement.
Market Context and Traffic Growth
The project addresses the growing demand for containerized EXIM cargo from the Chennai-Ennore industrial region and southern hinterland, serving key sectors including automobiles, auto components, engineering goods, electronics, and chemicals. Container traffic in India has grown at a compound annual growth rate of approximately 7% over the last five years, while KPL's container traffic has grown at 9.9% during the same period. In FY 2025-26, KPL handled 49.08 million tonnes of cargo and 1,008 vessels, including over 7 lakh TEUs of container traffic. The existing container terminal with 0.8 million TEUs capacity handled approximately 0.7 million TEUs, representing 88% utilization.
Strategic Impact and Employment Generation
The project aligns with Maritime India Vision 2030 and Maritime Amrit Kaal Vision 2047, expected to strengthen KPL's position as a container gateway on India's East Coast. It will improve maritime logistics efficiency, support trade and manufacturing, and enhance India's maritime competitiveness. The project is projected to generate employment for approximately 750 persons during construction and about 800 persons during operational phase. It supports Atmanirbhar Bharat objectives by augmenting domestic port capacity and improving logistics support for industries across Tamil Nadu, Karnataka, Andhra Pradesh, Telangana and adjoining regions. Notably, there will be no financial implication for the Government of India as the investment is entirely private.