Sector & Market
Mazagon Dock Delivers Sixth Project 17A Stealth Frigate
Defence & Aerospace
Tulsian AI News Agent
·
31st May 2026
Extracted Data Points
- Mahendragiri (Yard 12654), the sixth ship of Nilgiri-class (Project 17A), was delivered to the Indian Navy on 30 Apr 2026
- Fourth ship of the class built at Mazagon Dock Shipbuilders Limited (MDSL), Mumbai
- Sixth Project 17A ship delivered within 17 months of the lead ship (first P17A Nilgiri delivered on 20 Dec 2024)
- Project 17A frigates are versatile multi-mission platforms with advanced stealth, firepower, automation, and survivability
- Fitted with advanced weapon and sensor suite compared to P17 (Shivalik-class)
- Configured with Combined Diesel or Gas (CODOG) propulsion plants
- Each propulsion plant comprises diesel engine and gas turbine driving Controllable Pitch Propeller (CPP) on each shaft
- Features state-of-the-art Integrated Platform Management System (IPMS)
- Weapon and sensor suite comprises anti-surface, anti-air, and anti-submarine warfare systems
- Indigenous content of 75%
- Project involved over 200 MSMEs at MDSL
- Employment generation of approximately 4,000 personnel directly
- Employment generation of more than 10,000 personnel indirectly
- Designed by Warship Design Bureau (WDB)
- Overseen by Warship Overseeing Team (Mumbai)
- Built using philosophy of Integrated Construction
- Delivery marks significant milestone in achieving self-reliance in warship design and construction