Extracted Data Points

  • The Boregaon to Shahpur section of NH-753L is being developed as a modern four-lane highway corridor under the Bharatmala Pariyojana
  • Project cost: ₹944 crore
  • Total length: Nearly 47 kms
  • Construction progress: 85% complete
  • Key states connected: Madhya Pradesh & Maharashtra
  • Major connectivity: Indore – Khandwa – Burhanpur – Jalgaon – Chhatrapati Sambhajinagar (Aurangabad)
  • Khandwa and Burhanpur produce over 1.7 million metric tons of bananas annually
  • Region sends 140 heavily loaded trucks daily to domestic markets and international ports
  • Key infrastructure includes: 1 Railway Over Bridge (ROB), 7 Major Bridges, 20 Minor Bridges, 98 Culverts, 3 Light Vehicle Underpasses (LVUPs), 5 Small Vehicle Underpasses (SVUPs), 6 Vehicular Underpasses (VUPs)
  • Nearly 26 km bypass to decongest towns and urban areas
  • 19 km service roads for safer local movement
  • The corridor forms part of a larger corridor extending from Boregaon Bujurg to Muktainagar in Maharashtra
  • Maharashtra border is about 10 kms from the Shahpur-Burhanpur region
  • Jalgaon lies around 90 kms away from the region