Prime Minister Shri Narendra Modi will inaugurate and lay the foundation stone of Pune Metro projects worth approximately ₹21,800 crore on 3rd November 2026 at 12:30 PM through video conferencing. The event includes the inauguration of Pune Metro Line 3 (Pink Line) and the foundation stone laying for Phase-II of the metro expansion.
Project Details and Investment
The Pink Line (Line 3) has been constructed at a cost of over ₹8,300 crore and spans approximately 23 kilometres, connecting Maan to District Court Metro station. This corridor provides crucial metro connectivity between the Hinjewadi IT hub and Shivajinagar, serving as a vital transportation link for thousands of IT professionals and daily commuters. The line integrates with the existing metro network, offering seamless connectivity across Pune.
Phase-II Expansion
Phase-II of the Pune Metro project, with an estimated cost of around ₹13,500 crore, comprises four lines: 2A, 2B, 4, and 4A. Lines 2A and 2B will span a total length of approximately 12.75 kilometres, with Line 2A connecting Vanaz to Chandani Chowk and Line 2B connecting Ramwadi to Vitthalwadi. Line 4 will span about 25.52 kilometres connecting Kharadi to Khadakwasla, while Line 4A will cover 6.12 kilometres connecting Nal Stop to Manik Baug.
Operational Features and Sustainability
A distinctive feature of the Pink Line is its operation entirely by women train operators, representing a first-of-its-kind gender-inclusive initiative in public transportation. The project also emphasizes environmental sustainability, with approximately 30% of its total electricity requirements planned to be met through solar power generation.
Connectivity Benefits
The new metro corridors will connect several important locations including Kharadi, Magarpatta, Hadapsar, Swargate, Manik Baug, Nanded City, Pune Cantonment, and Warje. The eastern extension from Ramwadi to Vitthalwadi will significantly improve connectivity to rapidly developing residential, commercial, and IT hubs in Kharadi and Wagholi. The corridors will integrate with intercity bus services and the existing Pune Metro network through interchange facilities at Swargate, Nal Stop, and Kharadi Bypass.
Expected Impact
These infrastructure projects are expected to strengthen Pune's public transportation system, reduce dependence on private vehicles, ease traffic congestion, lower vehicular emissions, and provide commuters with an efficient and integrated urban mobility network. The enhanced connectivity will improve access to major employment centers, commercial areas, and residential neighborhoods across the metropolitan region.