Sector & Market
BSNL 4G Saturation Project Cuts Unconnected Villages 75%
DoT reduced villages without 4G connectivity by 75% from 45,180 in 2022 to 11,372 in 2026 through its saturation project.
BSNL's 18,291 commissioned sites handled 1.86 crore GB data in October 2026 se