Company News
Mumbai-Ahmedabad Bullet Train Third Tunnel Breakthrough
Third mountain tunnel breakthrough achieved for Mumbai-Ahmedabad Bullet Train Project in Palghar district, Maharashtra.
MT-07 tunnel spans 417 metres length and 14.4 metres width using controlled dril