ACME Solar Holdings subsidiary commissions 33.333 MW / 160.480 MWh Battery Energy Storage System (BESS) project in Rajasthan.
The project achieved commercial operation date (COD) on May 06, 2026.
Total commissioned capacity now stands at 200.003 MW / 962.940 MWh.
Disclosure made under SEBI Listing Regulations (Regulation 30).