Project Details
ACME Solar Holdings Limited (ASHL) through its wholly owned subsidiary ACME Sigma Urja Private Limited has commissioned FDRE contracted capacity of 57.69 MW. The project comprises total solar installed capacity of 100.02 MW along with Battery Energy Storage System (BESS) installed capacity of 57.69 MW / 265.38 MWh.
Project Location and Connectivity
The project is located at Village Kharnai, Tehsil Rawatbhata, District Chittorgarh, Rajasthan, and is connected to the Neemuch Pooling Station.
Commissioning and Commercial Operation
Commissioning date: November 19, 2026
Commercial Operation Date (COD): November 21, 2026
Contract Details
Power Purchase Agreement (PPA) for the project has been signed with NHPC Limited.